The complete formwork engineering platform

Engineering-Grade Formwork.No Spreadsheets. No Guesswork.

British Standard-compliant calculations, optimized cutting layouts, scaffolding material lists, and Gantt scheduling — all in one platform built for site teams.

3-day free trial
Cancel before day 3 — not charged
Under 5 min to first result
Scroll
−30%
Plywood waste reduction per slab
2 min
vs. 2–3 days of manual planning
100%
British Standard 5975 / 5268 compliant results
$5,000+
Saved per optimizer run
Trusted by leading firms

The Problem

Formwork is 20–30% of structure cost.
Most teams still plan it with spreadsheets.

Manual DXF tracing, rule-of-thumb calculations, and disconnected Excel files mean over-ordering, compliance gaps, and hours of rework — on every floor of every project.

Plywood Planning

Engineers manually trace DXF outlines and estimate cuts by eye — routinely over-ordering by 30–40% per floor.

~$8,000 wasted per floor
Falsework Design

Rules of thumb replace structural calculations. No code compliance check, no formal report — just unverified risk.

No BS 5975 compliance
Scaffolding MTO

Material take-offs counted manually from drawings. Over-ordering is the norm; shortages still happen mid-project.

10–20% over-procurement
Project Tracking

Gantt charts live in Excel with no link to material demand. Updates are manual. Forecasts are guesses.

Zero material visibility
PlyMax eliminates each of these — in one platform
Four engineering-grade tools. One login. No spreadsheets.
Start Free Trial

See It In Action

See PlyMax in Action

Watch this quick overview to see how PlyMax transforms plywood optimization from hours of manual work into minutes of intelligent automation.

PlyMax Demo Video

The Platform

Your formwork workflow,
completely reimagined.

From the first DXF upload to the final site report — every step of the formwork cycle, handled by purpose-built tools.

Plywood Optimizer — Detailed Results
Detailed Breakdown — screenshot coming soon
Track. Optimize. Save.

Plywood Lifecycle Optimizer

Track every sheet from purchase to disposal. Optimize material reuse and reduce waste through intelligent lifecycle management.

Complete Tracking

Track every sheet across multiple buildings and slabs

Lifecycle Management

Color-coded status detection for reuse optimization

Cost Optimization

Real-time cost savings and waste reduction metrics

Formwork Planner — Gantt Chart
Auto-Generated Gantt — screenshot coming soon
Schedule. Track. Visualise.

Formwork Planner

Link your material demand directly to your project schedule. Auto-generate Gantt charts per building, track planned vs actual slab progress, and get full 3D visualisation — all from one dashboard.

Auto-Generated Gantt Chart

Gantt charts built automatically from your slab sequence — no manual scheduling required

Planned vs Actual Tracking

Monitor real progress against the baseline schedule across every building and floor

Material Demand by Date

Know exactly how many sheets and props are needed on each date — no guesswork, no shortages

Cup Lock MTO — 3D Visualisation
3D Layout View — screenshot coming soon
Auto. Accurate. 3D.

Cup Lock MTO Calculator

Enter your slab dimensions and get a complete, itemised scaffolding material take-off in seconds — with 3D visualisation to verify the layout and an Excel export ready for procurement.

Automatic Take-Off

Standards, ledgers, transoms, base plates, and accessories counted automatically from your inputs — no manual spreadsheet required

3D Visualisation

Inspect the full scaffolding layout in 3D before ordering a single item

Excel Export

Download a procurement-ready itemised list with quantities and component codes

Falsework Calculator - Main Interface
BS 5975 Compliant — screenshot coming soon
Safe. Fast. Precise.

Falsework Calculator

Design safe formwork in minutes with automated load calculations, safety compliance checks, and professional PDF reports for your team.

Safety Compliance

Automatic load calculations with built-in safety factors

Instant Calculations

Generate formwork designs in minutes, not hours

Professional Reports

Export detailed PDF reports for your team

How It Works

From drawing to decision in minutes.

Three steps. No training required. Works for the full formwork cycle — plywood, falsework, scaffolding, and scheduling.

Step 01
Enter your project inputs

Each tool takes the inputs it needs: slab drawings or dimensions, load parameters, scaffolding layout, or building schedule — all in a guided form.

Slab drawingsProject dimensionsLoad parametersBuilding schedule
Step 02
Get engineering-grade results

PlyMax computes optimized cutting layouts, code-compliant structural designs, accurate material take-offs, and schedule-linked Gantt charts — in seconds.

Cutting layoutStructural calcsMaterial take-offGantt chart
Step 03
Export and execute on site

Download professional deliverables your whole team can act on: PDF engineering reports, cutting layout exports, Excel MTOs for procurement, and Gantt schedules.

PDF reportsLayout exportsExcel MTOsSchedule exports
1
Enter your project inputs

Each tool takes the inputs it needs: slab drawings or dimensions, load parameters, scaffolding layout, or building schedule — all in a guided form.

Slab drawingsProject dimensionsLoad parametersBuilding schedule
2
Get engineering-grade results

PlyMax computes optimized cutting layouts, code-compliant structural designs, accurate material take-offs, and schedule-linked Gantt charts — in seconds.

Cutting layoutStructural calcsMaterial take-offGantt chart
3
Export and execute on site

Download professional deliverables your whole team can act on: PDF engineering reports, cutting layout exports, Excel MTOs for procurement, and Gantt schedules.

PDF reportsLayout exportsExcel MTOsSchedule exports
Under 5 minutes from signup to first result
No installation, no training — works in your browser

Testimonials

Trusted by Industry Leaders

See what construction professionals are saying about PlyMax

"Throughout my career, I've insisted on manually planning our plywood layouts, it's simply smart business to reduce waste. PlyMax finally gives us a powerful system that automates this exact process, scaling that efficiency across every project. It's a significant and immediate win."
MM
Mohamed Mahlab
CEO
Rowad Modern Engineering
"PlyMax streamlined our entire cutting process. By moving work to the workshop and reducing miscuts, our team saved valuable time and progressed faster. The improvement to our workflow was significant."
HA
Hany Ahmed
Construction Manager
Rowad Modern Engineering
"The savings with PlyMax are already clear with standard plywood. But when we apply that same optimization to more durable, high-cost materials like PVC sheathing, the ROI is magnified significantly. It's a strategic shift in how we manage our most valuable assets."
HA
Haitham Abdelaal
Formwork Manager
Dorra Contracting

Pricing

Transparent plans for every team.

3-day free trial on all plans

Credit card required — cancel before day 3 and you won't be charged. All four tools included from day one.

Starter
For small teams running 1 active project
/mo · local taxes may apply
1 active project
2 buildings / project
1 optimizer run / month
All 4 tools included
Start 3-day trial
Most Popular
Professional
Most popular
/mo · local taxes may apply
5 active projects
3 buildings / project
5 optimizer runs / month
Full Gantt & 3D Overview
Start 3-day trial
Enterprise
Large contractors & GCC mega-projects
CustomTailored to your scale
Unlimited projects & buildings
Custom optimizer allocation
Dedicated CSM + 4h SLA
ERP integration & API access
Contact Sales
Save 5–7% on annual billing · Prices shown in USD · See all plans & annual pricing →

Get Started

Start optimizing formwork today.

Join construction teams across Egypt and the region. All four tools, one platform — start with a 3-day free trial.

Need a custom demo? Talk to us →

Credit card required
Cancel before day 3 — not charged
Full access for 3 days
Setup in under 5 minutes
−30%
Plywood waste per floor
2 min
vs. 2–3 days of manual work
100%
BS 5975 / BS 5268 compliance
$5,000+
Saved per optimizer run